Bespoke Synthetic Pitch for Withington Girls’ School

SSL are delighted to formally handover the reconstructed external sports facilities at Withington Girls’ School.

The project involved reconstruction of the school’s synthetic pitch which has also been performance tested as part of the FIH Quality Programme for Hockey Facilities. As part of the design, SSL incorporated customised team shelters and school logo’s within the synthetic pitch surrounds. This has created a bespoke facility that has immediately impressed both school staff and pupils alike.

Customised team shelters

The independent school, based in Manchester, selected SSL as project consultant to provide independent advice on options to refurbish the 20 year old synthetic turf pitch and upgrade the tarmac tennis courts. SSL’s consultants carried out feasibility work and provided outline cost options, all supported by extensive survey work of the old synthetic pitch.

Having provided an evaluation to the school on the different options available, SSL then developed a detailed schedule of works before administering a formal tender process on the school’s behalf.

After a final survey of the works, one of several carried out by SSL throughout the project, SSL confirmed that practical completion had been achieved and the facilities could be handed over to the school to put into use.

The project marks another successful sports facility project delivered by SSL within the UK independent school sector.

SSL deliver refurb of Cheshire sports courts

Just 37 days since construction started, over 3500m2 of macadam sports courts in Cheshire have been successfully refurbished in a project carefully designed and overseen by SSL.

SSL were first engaged by Helsby High School in May 2018 to provide an independent assessment and outline cost options to refurbish two blocks of old unusable macadam courts. With a preferred option identified, SSL developed a detailed specification document complete with bill of quantities and a suite of design drawings before tendering the scheme to several specialist contractors. Construction works were commenced by Fosse Contracts Ltd on 10th October with SSL carrying our key stage checks during the build to ensure the required industry construction standards were achieved.

The of 29th November saw official project handover, just 37 work days since works commenced!

Despite the winter weather kicking in, the school is now able to increase their sports provision, not just for pupils, but also for the local community.

A time lapse of the construction phase can be viewed at https://www.youtube.com/watch?v=_uQjns35ROI