Non-league stadium pitch conversion to an all-season 3G surface
Our key services included:
Inception Feasibility Study, Conceptual Design and Scheme Schedule
Development Site Investigations, Detailed design, Approvals, Cost plans and Health and Safety
Procurement Tender Documents and Tender Action
Construction Contract Administration and Construction Supervision
Post Construction Maintenance Advice and After Care and Annual Advice and Reporting
Project background
With 100+ matches played at home each season, Sutton Coldfield Town FC needed to convert their stadium pitch to a state-of-the-art 3G surface to ensure their football surface can satisfy a demanding match schedule. ‘The Royals’, who compete in The Evo-Stik League Northern Premier – First Division South, needed a first-class artificial turf to reflect their league status and high-performance requirements.
Project scope
Our focused project management enabled the scheme development and preparation to be efficiently arranged and construction was successfully completed within eight weeks.
Project result
Field testing was vital – securing the required FIFA 1 Star Field Certification in time for the new season.